platinum kw building

plainfield charter township, michigan

Client | Keller Williams

CLIENT OBJECTIVE

The client wanted to dress up a pre-engineered metal building for office space use.

PD SOLUTION

Designed exterior walls utilizing cold form metal framing with code required 2” continuous insulation and 5/8 plywood sheathing covered with either metal siding or masonry veneer.  The client was able to reduce construction cost by using a pre-engineered metal super structure, and meet the continuous insulation requirements required by the energy code.